T-05 · Free · No email wall

Compliance Narrative.

The decision tree, written up for your project. Applicability, the method you chose, and the submittal checklist — one PDF to drop into the AHJ package.

← ALL TOOLS →

01 — Project

02 — Code path

Adopted IBC edition
Does the hoistway connect more than three stories?
Does any hoistway door open into a rated corridor?
Exceptions that apply

Determination

Answer the questions above.

Educational summary, not code text. The design professional of record and the AHJ make the call.