T-01 · Flagship · Free · No email wall

Section 3006 Decision Tree.

Walk the 2021 & 2024 IBC §§ 3006.2 / 3006.3 path — threshold, rated-corridor rule, triggers, exceptions — then compare the five ways to comply before one of them eats your pro forma.

Quick reference

Prefer a one-pager?

Download the letter-size PDF — same logic and compliance options as the interactive tree, built for markups, meetings, and AHJ packets.

DOWNLOAD PDF →

IBC Chapter 30 · Section 3006

Do you need elevator smoke protection?

Two prongs, a handful of triggers, three exceptions. Answer the questions below and the code answers back — then compare the five ways to comply before one of them quietly eats your pro forma.

Code edition

1 · The threshold · § 3006.2

Does the elevator hoistway connect more than three stories, in a shaft required to be enclosed per § 712.1.1?

2 · THE RATED-CORRIDOR RULE · § 3006.2 CONDITION 6 & § 3006.2.1

Do any elevator hoistway doors sit in the wall of a fire-resistance-rated corridor?

This is the trigger everyone misses — it applies regardless of your answer above, and it's floor-specific. A rated corridor on one floor requires protection on that floor, even in a three-story building. In 2024 it also appears as condition 6 in the § 3006.2 list (per § 1020.1).

3 · The triggers · check any that apply

Does any one of these conditions describe the building?

4 · The exceptions · floor-specific relief

Does an exception apply anywhere?

Exceptions relieve individual floors — not the whole building.

The verdict

Answer the questions above.

Start with the three-story threshold, then the rated-corridor rule. The verdict updates as you go.

§ 3006.3 · Pick your protection

Five ways to comply.

All of them satisfy the code. The only real question is what each one does downstream — to floor area, to operations, and to the pro forma. Click each option to see what nobody puts on the drawing.

Works for

A curtain that isn’t there until it needs to be — concealed in a slim ceiling pocket, deployed only on alarm. Zero floor area, zero wayfinding impact, and it works with stack effect instead of fighting it.

Works against you

It’s a listed system, not a commodity: UL 1784 assembly, UL 864 control unit, ASME A17.1 coordination, and NFPA 105 inspection on a schedule. In 2024 it’s a named, first-class code path — no AHJ gymnastics required.

What it really costs

Upfront≈ $7K per curtain, installed
Maintenance≈ $600–1,200 / yr per building
Lost revenue$0 — no lobby, no footprint

Even a four-elevator lobby ≈ $28K per floor — still a fraction of what an enclosed lobby costs in rentable area.

What changed · 2021 → 2024

Curtains get their own path.

2024 adds § 3006.3(5) naming smoke-protective curtain assemblies outright. Under 2021, curtains comply via § 3006.3(3) “additional doors” as approved devices.

Rated corridors join the list.

2024 folds the rated-corridor trigger into § 3006.2 as condition 6. Under 2021 it lives in § 3006.2.1 — same effect, easier to miss.

A third exception appears.

2024 exempts levels where hoistway doors open directly to the exterior. 2021 phrased this as hoistway openings to the exterior.

Educational summary of IBC §§ 3006.2–3006.3 — not code text and not a substitute for the adopted code in your jurisdiction or your AHJ’s interpretation. Costs are planning-level approximations.

GET A BUDGET →